Werbung Gamesa landet einen neuen Auftrag für die Lieferung von 48 MW in China Produkte Techniken-Windkraft Windenergie Windparks Wirtschaft 12. Juli 2016 Hinweis: Die Bildrechte zu den Beitragsfotos finden Sie am Ende des Artikels Gamesa lands a new order for the supply of 48 MW in China (WK-intern) – The company has been contracted to install 24 G97-2.0 MW turbines (48 MW) for Chinese utility, Datang Gamesa, a global technology leader in wind energy, has secured a new order1 from Chinese utility Datang for the supply of 48 MW at Sanlengshan wind complex. The contract entered into with Datang contemplates the installation of 24 G97-2.0 MW turbines at the Sanlengshan complex located in the Liaoning region in north-eastern China. These turbines are due for delivery by the end of the year, which is when the facility is also expected to be commissioned. The cooperation between Gamesa and Datang dates back to the year of 2005. Since then, Gamesa has signed more than 200 MW projects with this utility. Gamesa’s presence in China, where it was the number one non-Chinese OEM by capacity instalments in 2015, dates back 16 years. In total, the company has supplied more than 4,000 MW in this market to date. This region accounted for 13% of the company’s total sales volumes (measured in MW) in 2015. 1Contract signed during the second quarter of 2016. PR: Gamesa Weitere Beiträge:Seit dem 1. Oktober 2012 ist Peter Quell Professor für Offshore-Anlagentechnik an der FH KielCNN wird am 19.1. 2012 um 20 Uhr weltweit über die Offshore-Entwicklung berichtenWINDFORCE 2013 in Bremerhaven: Alles dreht sich um Offshore-Windenergie