Repowering: Eneco und Vattenfall eröffnen den Windpark Slufterdam 2.0 mit Vestas Windanlagen Produkte Techniken-Windkraft Windenergie Windparks Wirtschaft 12. Februar 2019 Werbung Eneco and Vattenfall open Slufterdam 2.0 wind farm with twice as much power (WK-intern) - Eneco and Vattenfall will put a new, improved version of the Slufterdam wind farm into service today. The 17 existing wind turbines in the farm, which has been supplying renewable energy since 2002, have been replaced by 14 wind turbines that are much more efficient. As a result, the power has nearly doubled from 25.5 MW to 50.4 MW. The 14 wind turbines generate 180 GWh of electricity every year, enough to cover the annual consumption of around 60,000 households. The energy companies started preparations to replace the wind
Ausschreibungsverfahren: Vestas langfristige Kunde Eneco baut Windpark Slufterdam bei Rotterdam Finanzierungen Produkte Techniken-Windkraft Windenergie Windparks Wirtschaft 13. Juli 2017 Werbung Vestas erhält 22 MW Auftrag in den Niederlanden (WK-intern) - Nach einem wettbewerbsorientierten Ausschreibungsverfahren gewinnt der langfristige Kunde Eneco den Auftrag mit sechs V112-3,45 MW-Turbinen in 3,6 MW Power Optimized Mode für den Windpark Slufterdam bei Rotterdam. Vestas receives 22 MW order in the Netherlands After a competitive tender process, long-term customer Eneco places order comprising six V112-3.45 MW turbines in 3.6 MW Power Optimised Mode for the Slufterdam wind park near Rotterdam. The 22 MW firm and unconditional order is placed by Eneco via its special project company Windpark Eneco Slufterdam B.V. and includes supply and commissioning of the turbines as well as