Kostensenkung bei der LiDAR Leistungsmessung Techniken-Windkraft Windenergie Windparks Wirtschaft 16. November 2015 Werbung Reducing costs for power curve measurements: Site calibration performed with LiDAR For the first time ever, LiDARs were used for a site calibration in preparation of IEC-compliant power curve certification measurements for a wind turbine prototype. (WK-intern) - Stand-alone LiDARs have been used for years to assess the wind resource for project development. The technology has global recognition within the wind energy industry and the adoption of LiDARs for IEC-compliant power curve measurements is scheduled to be included in the new revision of the IEC 61400-12-1. Normally, a site calibration is executed using two identical met masts. The use of two
Vestas erhält 40 MW-Windleistungsauftrag aus dem US-Bundesstaat Maine Produkte Techniken-Windkraft Windenergie Windparks Wirtschaft 26. März 2015 Werbung Vestas hat einen Auftrag für 13 Vestas V112-3.075 MW-Wind-Turbinen für den Windpark in Passadumkeag Penobscot County, Maine erhalten (WK-intern) - Vestas receives 40 MW order in U.S. state of Maine Vestas continues its expansion in Maine with an order for 13 new turbines. Vestas has received a firm and unconditional order in the United States for 13 V112-3.075 MW turbines for the Passadumkeag wind farm in Penobscot County, Maine. The order was placed by Passadumkeag Windpark, LLC, an affiliate of Quantum Utility Generation, LLC. The project’s scope includes supply and commissioning of the wind turbines as well as a five-year Active Output Management (AOM